Deliverables

Only the public deliverables can be downloaded.

 

Work Package 1: Stakeholder Requirements and Industry/Research Gaps

NumberTitleLead beneficiaryDissemination levelState
D1.1A report on the challenges to improve community resilience to EILD eventsARUPublicApproved
D.1.2Proceedings of the first stakeholder/end-user workshop: including the workshop presentationsUNICASConfidentialApproved
D1.3Report outlining a risk based assessment and resilience improvement frameworkARUPublicApproved
D1.4Detailed user requirements and research output protocols for the LIQUEFACT Reference Guide; in line with second workshop outcomeARUPublicApproved

 

Work Package 2: European Liquefaction Hazard Map (Macrozonation) and Methodology for Localized Assessment of Liquefaction Potential (Microzonation)

NumberTitleLead beneficiaryDissemination levelState
D2.1Report on ground characterization of the four areas selected as testing sites by using novel techniques and
advanced methodologies to perform in situ and laboratory tests
UNIPVConfidentialApproved
D2.2GIS platform including data for liquefaction hazard assessment in Europe (version 1)UNIPVConfidentialApproved
D2.3GIS platform including data for liquefaction hazard assessment in Europe (version 2)UNIVPConfidentialApproved
D2.4GIS database of the historical liquefaction occurrences in Europe and European empirical correlations to
predict the liquefaction occurrence starting from the main seismological information.
UNIPVPublicSubmited
D2.5GIS platform including data for liquefaction hazard assessment in Europe (version 3)UNIPVConfidentialSubmited
D2.6Report to describe the adopted procedure for the development of the European liquefaction hazard map.UNIPVPublicSubmited
D2.7Report to illustrate the methodology to perform localised liquefaction analysis within the framework of the
European liquefaction hazard map and its application to four case-studies sites
UNIPVPublicSubmited

 

Work Package 3: Structural Liquefaction Resilience & Vulnerability Assessment Methodologies

NumberTitleLead BeneficiaryDissemination levelState
D3.1State of the art review of numerical modelling strategies to simulate liquefaction-induced structural damage and of uncertain/random factors on the behaviour of liquefiable soilsUPORTOPublicApproved
D3.2Methodology for the liquefaction fragility analysis of critical structures and infrastructures: description and case studiesUPORTOPublicSubmited
D3.3Design guidelines for the application of soil characterization and liquefaction risk assessment protocolsUPORTOPublicSubmited

 

Work Package 4: Comparative Analysis of State of the Art Liquefaction Mitigation Measures

NumberTitleLead beneficiaryDissemination levelState
D4.1Report on the comparison of soil response before and after ground treatment at the pilot siteUNINAConfidentialSubmited
D4.2Report on validation of retrofitting techniques from small scale modelsISMGEOPublicApproved
D4.3Report on demonstration of retrofitting techniquesTREVIPublicSubmited
D4.4Database of calibrated numerical modelling resultsUNINAPublicSubmited
D4.5Liquefaction mitigation techniques guidelines (to be used for WP6 and WP7)UNINAPublicSubmited

 

Work Package 5: Community Resilience and Built Asset Management Planning Framework

NumberTitleLead beneficiaryDissemination levelState
D5.1Report on individual stakeholder and urban community performance metricsARUPublicApproved
D5.2Data collection toolkit for community resilience case studies (for WP6/7)ARUPublicApproved
D5.3Community resilience and cost/benefit modelling framework (socio-technical-economic impact on stakeholder and wider communityARUPublicApproved
D5.4Whole life built asset management modelling frameworkARUPublicSubmited

 

Work Package 6: Liquefaction Mitigation Planning Software – Integrated Knowledge and Methodologies from WP2, 3, 4 and 5

NumberTitleLead beneficiaryDissemination levelState
D6.1 Software toolbox for liquefaction mitigation planning and decision supportNORSARConfidentialApproved
D6.2Software toolbox development – Part1: Integration of procedures for performing localised liquefaction analysis, and development of liquefaction hazard mapNORSARConfidentialSubmited
D6.3Software toolbox development – Part2: Integration of procedure for liquefaction vulnerability analysis NORSARConfidentialSubmited
D6.4Software toolbox development – Part3: Built-in liquefaction vulnerability modelsNORSARConfidentialSubmited
D6.5Software toolbox development – Part4: Integration of procedure of liquefaction mitigation measuresNORSARConfidentialSubmited
D6.6Development of technical manual and ApplicationNORSARPublicSubmited

 

Work Package 7: Case Study Validation and Future Eurocode Recommendations

NumberTitleLead beneficiaryDissemination levelState
D7.1Manual for the assessment of liquefaction risk, defining the procedures to create the database, collect, define, symbolize and store information in the Georeferenced Information System and to perform and represent the risk analysisUNICASPublicSubmited
D7.2Risk analysis on the selected past EILD cases, respectively for a large to medium city, a small industrial district and a lifeline. All data will be reported in a Geographical Information SystemsUNICASConfidentialSubmited
D7.3Full and detailed case study report of the application of the risk/resilience assessment toolbox for the selected past EILD cases, published in the form of papers on international journalsUNICASPublicSubmited
D7.4Guidelines for the use of ground improvement technologies to mitigate the liquefaction risk on critical infrastructuresUNICASPublicSubmited

 

Work Package 8: Dissemination and Exploitation

NumberTitleLead beneficiaryDissemination levelState
D8.1LIQUEFACT project websiteUNICASPublicApproved
D8.218 Scientific
publications
UNICASPublicSubmited
D8.37 case studies’
dissemination material
TREVIPublicSubmited
D8.4Business model
innovation report
TREVIConfidentialSubmited
D8.5Exploitation strategy
– LIQUEFACT
Reference Guide
(software & standards
recommendation)
NORSARConfidentialSubmited

 

Work Package 9: Consortium / Project Management

NumberTitleLead beneficiaryDissemination levelState
D9.1Project Management
Plan
ARUConfidentialApproved
D9.2Quality Procedures Manual FinalARUPublicApproved
D9.3Project Board
Management Report 1
ARUConfidentialApproved
D9.4Periodic Progress Report 1 FinalARUPublicApproved
D9.5Project Board
Management Report 2
ARUConfidentialApproved
D9.6Periodic Progress Report 2ARUPublicApproved
D9.7Project Board
Management Report 3
ARUConfidentialApproved
D9.8Periodic Progress Report 3ARUPublicApproved
D9.9Project Board
Management Report 4
ARUConfidentialApproved
D9.10Periodic Progress Report4ARUPublicApproved
D9.11Project Board
Management Report 5
ARUConfidentialSubmited
D9.12Periodic Project
Progress Report 5
ARUPublicSubmited
D9.13Project Board
Management Report 6
ARUConfidentialSubmited
D9.14Periodic Project
Progress Report 6
ARUPublicSubmited
D9.15Project Board
Management Report 7
ARUConfidentialSubmited
D9.16Initial Data Management Plan v.1.0ARUPublicApproved
D9.17Initial Data Management Plan v.2.0ARUPublicApproved
D9.18Initial Data Management Plan v.3.0ARUPublicApproved
D9.19Data Management
Plan v4
ARUPublicSubmited