WP4: well screen installation at test field in Pieve di Cento

The installation of well screens started on May 30th at the selected site at Pieve di Cento Municipality (Emilia Romagna region, Italy).

The compliance between the geometrical design and the actual position of the horizontal well screens is essential for the success of the tests.

The use of TREVI Horizontal Directional Drilling (THDD), together with TREVI reamers is giving great results in terms of precision of installation, achieving a negligible disturb to the in situ soil.

Two mitigation technologies, Induced partial Saturation and Horizontal Drains, will be tested soon.